午夜久久久久久久|国产综合在线小说|日韩欧美成人一区|黄色电影网址大全|嫩草地址在线观看|日本高清大道免费|欧美大片在线三区|孕妇性交免费视频|在线免费观看 A|久草社区在线视频

Project cases

PROJECT

Ethiopia—Djibouti Gas Pipeline Project

Date:2019-10-25

The Ethiopia-Djibouti gas pipeline starts from the first station at the Calub gas field in the Ogaden Basin in Ethiopia and ends at the end station in Djibouti. Total length of the pipeline is 749.4 km, including 663.26 km in Ethiopia and 86.14 km in Djibouti. The designed transportation capacity is 16.51 billion cubic meters per year. The preliminary design of the pipeline has been completed. Construction is expected to begin in 2019 and officially put into operation by end of 2021. HPHE will act as a subcontractor and participate in this project.


Return